Featured projectIndustrialProp markets this project on behalf of the developer.
Amverton Carey FAQ for buyers
Quick answers to the questions buyers ask most about Amverton Carey Phase 1. For the price list, lot availability or anything not covered here, contact Jay directly.
Amverton Carey, faq
- Buyer questions answered22
- Price list from JayOn request
- TenureLeasehold to 2107
- Lots available, 14 October 202614 of 24
Buyer questions
What is Amverton Carey Eco Business Park?
A 600-acre industrial park on Carey Island in Kuala Langat, Selangor, by the developer Amverton. Phase 1 covers 227.94 acres. The current release is 24 medium-industrial land lots of 2.14 to 2.98 acres, sold as vacant land.
Is Amverton Carey freehold or leasehold?
Leasehold, with about 81 years remaining and expiry in 2107. Owners can apply to the land office to extend the lease to a fresh 99 years. The developer indicates 6 to 9 months for approval, with the premium calculated by formula on current market value and the years added.
How much does a lot cost?
Prices are on request and vary by lot size and position. An early-bird package with legal-fee waivers is currently running. WhatsApp Jay for the current price list.
How many lots are still available?
As at 14 October 2026, 14 of the 24 lots are available. Lots 7, 8, 10, 11, 12, 13, 14, 15, 19 and 24 are booked. Status changes quickly in an early release, so confirm before visiting.
Am I buying land or a factory?
Land. Phase 1 is a land-only sale, so you design and build your own facility and connect to the developer’s main tapping points for electricity, water, sewerage and drainage. Detached, semi-detached and terrace factories are proposed for later phases.
What power supply does each lot get?
Each lot currently has a 400A allocation. The developer is negotiating with TNB for higher allocations because manufacturing users will need more. If your load is above 400A, raise it before booking.
When will the infrastructure be ready?
Site clearing has started. The developer targets completing Phase 1 infrastructure within three years, backed by the state’s IWSS water supply scheme for Carey Island, which the developer contributes to.
How far is Amverton Carey from Westport?
About 25 km, or 21 minutes, once the committed SKVE Pulau Carey interchange opens, per the developer’s client-briefing kit. That is about 40 minutes quicker than today’s drive round by the Telok Panglima Garang bridge.
Has the Carey Island third port been approved?
Yes. The federal Cabinet approved Port Klang’s third terminal on Carey Island on 11 March 2026. The next gates are the port licence and the choice of operator.
When will the Carey Island port be completed?
It is being built in phases over up to 20 years, adding capacity step by step under a build-operate-transfer concession.
How do you get to Carey Island today?
By road via the SKVE, which has a Pulau Carey interchange, and by the existing Jalan Pulau Carey from the Banting and Telok Panglima Garang side.
Which infrastructure on Carey Island is committed?
The SKVE Pulau Carey interchange and TNB’s 500 kV transmission line with main intake substations. The rail, LRT, new bridges, WCE junction and water treatment plant are proposals.
Can I get a loan for leasehold industrial land?
Yes. Leasehold industrial land is widely financed in Malaysia. With about 81 years left, a 15- or 20-year loan clears common bank thresholds.
Is Carey Island part of Klang or Kuala Langat?
Carey Island is in Mukim Jugra, Kuala Langat district, administered by the Kuala Langat municipal council. Pulau Indah, across the channel, is in Klang district.
Who will operate the third terminal?
Selangor is reviewing potential operators, and a state-owned subsidiary will hold a stake in the terminal’s operations.
Will the port raise industrial land prices on Carey Island?
Ports tend to lift demand for logistics land near the gate first, with wider effects as roads and rail arrive. Approvals often move prices before operations begin.
What is the Carey Island master plan?
Selangor’s development plan for the island (Laporan Pelan Induk Pembangunan Pulau Carey), prepared for PLANMalaysia Selangor in December 2023. It sets out the port zone, a superblock road grid, rail and LRT proposals, and utilities.
Will there be a train to Carey Island?
The master plan proposes a KTM rail loop from the existing West Port station with stations at Carey 1, 2 and 3, plus an LRT 3 extension.
Is Kuala Langat cheaper than Klang for industrial property?
Yes, on Industrialprop’s data. The median built-up price in Kuala Langat is about RM394 psf against about RM457 psf in Klang, across 2021 to 2025 transactions.
Where is new freehold industrial land in southern Selangor?
Most new freehold supply is in master-planned parks around Banting and Olak Lempit, with handovers from 2027. Pulau Indah and Carey Island are mostly leasehold.
Is 80 years left on a lease enough?
For most buyers, yes. With 80 years left, a 15- or 20-year loan typically ends with 60+ years remaining.
How does leasehold compare with freehold on price?
On a like-for-like basis, Industrialprop’s model puts the typical difference at only about RM52,000 per Klang Valley deal.
Before you enquire
Tell Jay your name, your company, the lot you are interested in (or any available lot), what you are after, and a line on your operation.
- Price list and lot availability
- Site visit
- Brochure
- Financing and tenure questions
Viewing the site
Viewing Carey Island takes a half day from KL. Jay can pair it with a look at the Amverton Cove clubhouse, five minutes from the site.
About this information
Information compiled by Industrialprop from the developer’s sales kit, Q&A sheet and architect’s layout (Oct 2025 to Oct 2026) and from public reports. Lot status is as at 14 October 2026. Plans are schematic, measurements approximate, and all details are subject to the developer’s final documentation and authority approval. Nothing here forms part of an offer or contract.

Ask Jay Kew about Amverton Carey
REN57969, CID Realtors Sdn Bhd (1561323-W)