Amverton Carey infrastructure: power, water, roads and flood measures
Each Amverton Carey lot has a 400A power allocation, and the developer is negotiating with TNB for more. You connect to the developer’s main tapping points for electricity, water, sewerage and drainage. Phase 1 infrastructure is targeted within three years.
Amverton Carey, infrastructure
- Power per lot today400A
- Phase 1 infrastructure target3 years
- Internal roads, sized for container trucks66 ft
- Main road frontage100 ft
- Plus retention ponds sized to JPS guidelinesCoastal bund
The island’s infrastructure plan
What the master plan commits and what it only proposes. Tap an item to find it on the map.
Tap an item to find it on the map.
Power
Each lot currently has a 400A allocation. The developer is negotiating with TNB for higher allocations, because manufacturing users will need more.
On the island, TNB’s 500 kV line and main intake substations are committed.
Water
The developer targets completing Phase 1 infrastructure within three years, backed by the state’s IWSS water supply scheme for Carey Island, which the developer contributes to.
The master plan also proposes a water treatment plant that can be upgraded to desalination, and sewage treatment for the north and south of the island.
Your connections
Phase 1 is vacant land. You build your own facility and connect to the developer’s main electricity, water, sewerage and drainage tapping points.
Roads and rail on the island
The SKVE runs across the island’s north and connects east to Saujana Putra, Putrajaya and the airport highways. The master plan adds main roads roughly every 1.5 km.
The proposed KTM loop runs from the existing West Port station into the island, with stations named Carey 1, 2 and 3 and a transit-oriented hub at Carey 3. For a port, rail is about freight first; passenger use comes later.
Roads and layout
The park is designed as a working estate rather than a bare subdivision:
- 66 ft internal roads sized for container trucks
- 100 ft main road frontage
- Centralised fleet parking
- Retention ponds and green buffers
Flood measures
Carey Island has a coastal bund, and the park’s retention ponds are sized to JPS guidelines.
Sustainability
The park has provisions for rooftop solar and rainwater harvesting.