Featured projectIndustrialProp markets this project on behalf of the developer.

Amverton Carey location: Westport, the SKVE and the third port

Amverton Carey is on the eastern side of Carey Island in Kuala Langat. Once the committed SKVE Pulau Carey interchange opens, Westport is 25 km and about 21 minutes away. Cabinet approved the island’s third port in March 2026.

Amverton Carey, location

  • SKVE interchange, about 5 min (committed)5 km
  • West Port today, about 1 hr54 km
  • North Port today, about 1 hr55 km
  • KLIA today, about 1 hr 5 min66 km
Drive from Amverton Carey to Westport once the SKVE Pulau Carey interchange opensStrait of MalaccaCarey IslandPulau IndahTelok Panglima GarangBantingPutrajayaSKVE Pulau Carey interchange (committed)WestportNorthportKLIAAmverton Carey
Routes follow the roads Google Maps picks as fastest; map drawn from OpenStreetMap data. Dashed is today’s drive, round by the Telok Panglima Garang bridge.

How far it is by road

The committed SKVE Pulau Carey interchange puts Westport about 21 minutes away. Times once it opens are from the developer’s client-briefing kit; today’s are Google Maps, usual traffic, checked 22 November 2026.

  • SKVE interchangecommitted5 kmabout 5 min

The third port, and where this land sits

Carey Island: the third port zone and what is committed or proposedSchematic map of Carey Island. The third port zone of about 4,438 hectares sits on the south-west coast. The SKVE crosses the north of the island, with the committed Pulau Carey interchange about 5 km from Amverton Carey on the east side. Proposed rail, LRT, a road grid, bridges and a water treatment plant are drawn dashed.Third port zoneabout 4,438 haSKVEJalan Pulau CareyAmverton CareyStrait of MalaccaPulau IndahTelok Panglima GarangJugraJenjarom
Schematic, not to scale. Redrawn from the Carey Island Development Master Plan (PLANMalaysia Selangor, Dec 2023). Solid lines are committed; dashed lines are proposals.

Tap an item to find it on the map.

How far it really is by road

Carey Island sits directly south of Pulau Indah and Westport. The site’s road access comes from the SKVE, with a dedicated Pulau Carey interchange, committed to develop, about 5 km away. Today the drive goes round by the Telok Panglima Garang bridge; the interchange cuts that out.

Today’s times are Google Maps in usual traffic (checked 22 November 2026). Times once the interchange opens are from the developer’s client-briefing kit.

  • SKVE interchange (committed), Pulau Carey exit: 5 km, about 5 minutes once built
  • Westport, Pulau Indah: 25 km and about 21 minutes once the interchange opens, about 40 minutes quicker than today’s 54 km drive
  • Northport, Port Klang: 33 km and about 30 minutes once it opens, about 30 minutes quicker than today
  • KLIA and klia2: 53 km and about 42 minutes via the SKVE and ELITE once it opens, about 25 minutes quicker than today

What this means on the ground

For a logistics or container-handling operator, the useful number is Westport at about 21 minutes. That is comparable to many Klang and Pulau Indah sites, on land that is bigger and newer than most of what trades there.

KLIA and klia2 are about 42 minutes away via the SKVE and ELITE.

Selangor’s 2026 to 2035 road plan also proposes a new link from the West Coast Expressway to Carey Island. It is a proposal, not a committed project.

Sources: Evolusi Bina, Oct 2026 (JALUR Selangor)

Where this site sits in the master plan

Amverton Carey is on the island’s east side, between the SKVE interchange and Jalan Pulau Carey: outside the port zone, and inside its logistics catchment.

Selangor’s master plan, prepared for PLANMalaysia Selangor in December 2023, lays the island out as 3 km by 3 km superblocks of about 2,000 acres. Each splits into four 1.5 km blocks of about 500 acres, which can be gridded further into blocks of 125 down to 30 acres, with all-turn junctions on main roads.

Large blocks with all-turn junctions suit trucks. These are road-grid blocks, not land parcels for sale, but blocks this size leave room for big logistics and industrial sites, the kind that is hard to assemble in older parts of the Klang Valley.

Why Port Klang needs a third terminal

Port Klang handled 14.64 million containers (TEUs) in 2024 through Westport and Northport, against a handling capacity of about 15.14 million. Singapore’s Tuas megaport is being built for around 60 million TEUs a year, rising to 65 million at full completion. In July 2026 the Transport Minister put the gap plainly: Tuas will be roughly three times the size of today’s Port Klang.

Westport’s own Phase 2 expansion adds capacity, but it runs out of room on Pulau Indah. Carey Island sits directly south across the channel, is mostly flat plantation land, and is owned largely by a single plantation group. That combination is rare on the Straits of Malacca, and it is why the island was chosen.

The third port: timeline so far

Every step below is from a published report; the reports are linked underneath.

Port Klang Free Zone expects the new terminal to add cargo volume to the surrounding logistics ecosystem rather than compete with it.

  • Sep 2025: Selangor identifies 1,699.68 ha (about 4,200 acres) for the terminal: 2,500 acres of seabed under PKNS and 1,700 acres of coastal land held by Yayasan Selangor
  • Dec 2025: land-related matters for the terminal are finalised, according to the Menteri Besar
  • 11 Mar 2026: the federal Cabinet approves Port Klang’s third terminal on Carey Island, giving the project the federal go-ahead
  • 13 Mar 2026: Selangor moves to complete the Pulau Carey port master plan, led by the state planning unit (UPEN) and PKNS, including a special economic zone
  • 18 Jun 2026: the ministry confirms a build-operate-transfer concession model, with land matters with the state as the first step
  • 8 Jul 2026: the Transport Minister says the port will be built in phases over up to 20 years
  • 10 Jul 2026: Selangor targets groundbreaking as early as September 2026 while it reviews potential operators

Sources: Malay Mail, Sep 2025, NST, Jul 2026 (PKFZ), Bernama, 11 Mar 2026, Bernama, 13 Mar 2026, Bernama, 18 Jun 2026, NST, 8 Jul 2026, EdgeProp, 10 Jul 2026

How big the port is

Selangor first identified about 4,200 acres for the terminal, seabed and coast combined. The Carey Island master plan sets aside a port zone of about 11,000 acres (4,438 ha) at full build-out, including the terminals, back-up land and port-related industry.

The two figures are often confused. The 4,200 acres is the first package the state put forward; the 11,000 acres is the master plan’s long-run port zone.

Selangor is reviewing potential operators, and a state-owned subsidiary will hold a stake in the terminal’s operations.

Who owns Carey Island

The island covers about 14,674 hectares (roughly 36,000 acres). Most of it is still oil palm under one plantation owner, which is why large, clean industrial parcels are possible here.

That matters more than it sounds. A planner can draw a grid across land held by a few parties far more easily than across thousands of small titles, which is why the island can grow as one planned industrial corridor.

  • SD Guthrie (Sime Darby Plantation): 79%
  • Yayasan Selangor: 8%
  • Amverton: 5%
  • Orang Asli reserve: 3%
  • Others: 5%

What this means for your site

From Jay’s guide to the Carey Island master plan:

  • Access is the SKVE and its committed Pulau Carey interchange, about 5 km from the site
  • Rail is planned with freight in mind: the proposed KTM loop runs from West Port station to Carey 1, 2 and 3
  • Each lot comes with a 400A power allocation, and Jay can get the power and water details for your lot in writing
Jay Kew

Ask Jay Kew about Amverton Carey

REN57969, CID Realtors Sdn Bhd (1561323-W)

Ask Landy about Amverton Carey

Ask anything about this property

Get AI-powered insights and analysis

Try:
Powered by Landy AI